The effectiveness of the system is particularly important on inclined surfaces, for example, garage ramps. Please note, it is not necessary to heat the entire driveway as only the small areas that vehicle tires tread need to be secured.
For driveways with steep angles, a linear drainage system is required to drain the water from melting snow and ice. This channel must also be protected from freezing.
For stairs, the cables are laid in the form of loops arranged across the steps, maintaining a sufficient distance between the adjacent sections. On new constructions, the installation is laid on the surface of the stairs and overlaid with a concrete layer with a thickness of three to five centimeters. On old stairs, the cables should be placed in grooves and overlaid with concrete, with an addition of plasticizer. Concrete should adhere closely to the entire surface of the cable without the presence of air bubbles.