Danfoss Solar Inverters at Eggebek, Germany

80 MW string inverters PV plant Eggebek, Germany - Ground build

Project: Eggebek, Möhring Energie GmbH, Germany
Size: 83.932 MW 
Inverters: 5061 TLX Pro+ 15k and 257 TLX Pro+ 10k 
Mounting: Ground Build
Modules: 371,089 modules (5 models from 185 Wp to 240 Wp)
Date: Dec 2011
The 80 MW Eggebek developed by Sasha Mohring of Mohring uses the string inverter concept from Danfoss to the full. CEO and owner of Möhring Energie GmbH, Sascha Möhring, explains the reason for choosing Danfoss’ string inverter solution: “We are able to achieve a much higher energy output with Danfoss’ solution at the airfield area compared to central inverters. Moreover Danfoss’ technology with three MPP trackers makes it possible to optimize even further compared to other string inverter solutions, because shading losses are minimized.”   
 
Another advantage of the string inverter solution is that installation can take place in several parts of the plant at the same time with the teams eventually meeting up in the middle. This makes the installation process far more efficient thus bringing down costs significantly.

The Master functionality feature of Danfoss’ TLX Pro inverters also makes the installation more efficient. The master inverter can handle a large group of inverters – the settings of the master are replicated to the inverter network thus lowering commissioning costs.